

Type of Document Master's Thesis Author Komar, Paul Author's Email Address pkomar@vt.edu URN etd-01262005-220242 Title The Architecture of Morning and Afternoon Degree Master of Architecture Department Architecture Advisory Committee
Advisor Name Title Emmons, Paul F. Committee Chair Frascari, Marco Committee Member Piedmont-Palladino, Susan C. Committee Member Ritter, James William Committee Member Keywords
- good shepherd
- california
- santa cruz
- elementary school
Date of Defense 2004-09-17 Availability unrestricted Abstract The architecture of Morning and Afternoon. Create still life paintings using tenets of Purism to search for new form(s) from real objects. The paintings will be used to inspire and inform new designs for and architecture project. Using painting to study architecture will necessitate a dual world of painting from reality and designing architecture to become a reality. Purism means to learn to look at an object and truly see it as an object with its own qualities. Still life objects placed where the canvas is a space to design and multiple views of those objects are revealed at once. Objects like bottles, plates and other forms that have remained consistant over generations of refinement. Architectural approaches of drawing like axonometric will be used to help form a critical way of seeing.
The project is for the Good Shephard Elementary school for the Diocese of Monterey in Santa Cruz, California. The elementary school serves roughly 300 students that include pre-school up to 8th grade. The school is currently housed in a building that was constructed roughly 20 years ago and is at maximum capacity. The school owns and occupies a large piece of property in the Santa Cruz city and after school, weekends and during breaks the school is used as a soccer field for the town soccer league. The school is situated in the southern end of the city of Santa Cruz and accessible by car but does not front any major streets. Highway 1 runs south to north just to the west of the school grounds and is a major conduit of automobile traffic to the city.
Files
Filename Size Approximate Download Time (Hours:Minutes:Seconds)
28.8 Modem 56K Modem ISDN (64 Kb) ISDN (128 Kb) Higher-speed Access book1_morning.pdf 3.00 Mb 00:13:53 00:07:08 00:06:15 00:03:07 00:00:16 book2_afternoon.pdf 1.32 Mb 00:06:06 00:03:08 00:02:44 00:01:22 00:00:07
If you have questions or technical problems, please Contact DLA.