| Type of Document |
Master's Thesis |
| Author |
Altman, James Ross
|
| Author's Email Address |
jaltman@vt.edu |
| URN |
etd-02102008-120036 |
| Title |
A Practical Comprehensive Approach to PMU Placement for Full Observability |
| Degree |
Master of Science |
| Department |
Electrical and Computer Engineering |
| Advisory Committee |
| Advisor Name |
Title |
| Centeno, Virgilio A. |
Committee Chair |
| De La Ree Lopez, Jaime |
Committee Member |
| Liu, Yilu |
Committee Member |
|
| Keywords |
- Depth of Unobservability
- observability
- PMU placement problem
- greedy algorithms
- placement model
|
| Date of Defense |
2008-01-28 |
| Availability |
unrestricted |
Abstract
In recent years, the placement of phasor measurement units (PMUs) in electric transmission systems has gained much attention. Engineers and mathematicians have developed a variety of algorithms to determine the best locations for PMU installation. But often these placement algorithms are not practical for real systems and do not cover the whole process. This thesis presents a strategy that is practical and addresses three important topics: system preparation, placement algorithm, and installation scheduling. To be practical, a PMU strategy should strive for full observability, work well within the heterogeneous nature of power system topology, and enable system planners to adapt the strategy to meet their unique needs and system configuration. Practical considerations for the three placement topics are discussed, and a specific strategy based on these considerations is developed and demonstrated on real transmission system models.
|
| Files |
| Filename |
Size |
Approximate Download Time
(Hours:Minutes:Seconds) |
| 28.8 Modem |
56K Modem |
ISDN (64 Kb) |
ISDN (128 Kb) |
Higher-speed Access |
| |
Altman_Thesis.pdf |
693.00 Kb |
00:03:12 |
00:01:38 |
00:01:26 |
00:00:43 |
00:00:03 |
|