Title page for ETD etd-05072012-205937


Type of Document Master's Thesis
Author Wallace, Carlington W
Author's Email Address cwwallac@vt.edu
URN etd-05072012-205937
Title Comparing Two Methods for Developing Local Sediment TMDLs to Address Benthic Impairments
Degree Master of Science
Department Biological Systems Engineering
Advisory Committee
Advisor Name Title
Benham, Brian L. Committee Chair
Gallagher, Daniel L. Committee Member
Yagow, Eugene R. Committee Member
Keywords
  • Virginia
  • Sediment
  • TMDL
  • Reference Watershed Approach
  • Disaggregate Method
  • Chesapeake Bay
  • Benthic Impairments
Date of Defense 2012-04-23
Availability unrestricted
Abstract
Excessive sedimentation is a leading cause of aquatic life use impairments in Virginia. As required by the Clean Water Act, a total maximum daily load (TMDL) must be developed for impaired waters. When developing a TMDL for aquatic life use impairment where sediment has been identified as the primary pollutant, the target sediment load is often determined using a non-impaired reference watershed, i.e., the reference watershed approach (RWA). The RWA has historically been used in Virginia to establish TMDL target sediment loads because there is no numeric ambient water quality criterion for sediment. The difference between the sediment load generated by the reference watershed and the load generated by the impaired watershed is used to determine the sediment load reduction required to meet the TMDL target load in the impaired watershed.

Recent quantification of the Chesapeake Bay TMDL based on Phase 5.3 of the Chesapeake Bay Watershed Model (CBWM) offers a simpler and potentially more consistent method of calculating target sediment loads for impaired watersheds within the Chesapeake Bay watershed. Researchers in the Biological Systems Engineering department at Virginia Tech have developed the “disaggregate method” (DM) which uses landuse inputs to, and pollutant load outputs from, the CBWM to determine pollutant load reductions needed in watersheds whose areas are smaller than the smallest modeling segments generally used in the CBWM. The DM uses landuse-specific unit area loads from two CBWM model runs (an existing condition run and TMDL target load run) and a finer-scale, locally assessed landuse inventory to determine sediment loads. The DM is simpler and potential more consistent than the reference watershed approach. This study compared the reference watershed approach and the disaggregate method in terms of required sediment load reduction. Three sediment-impaired watersheds (Long Meadow Run, Taylor Creek and Turley Creek) within the Chesapeake Bay watershed were used for the study.

Study results showed that the TMDL development method used to determine sediment loads would have noticeable effects on resulting sediment-load reduction requirements. For Taylor Creek, the RWA required 20.4 times greater reductions in sediment load (tons/yr) when compared to the DM. The RWA also required 9.2 and 10.4 times greater reductions for Turley Creek and Long Meadow Run watersheds, respectively. On a percentage basis, the RWA for reduction Taylor Creek was 7.3 times greater than that called for by the DM. The RWA called for 4.4 and 4.6 times greater percent reductions for Turley Creek and Long Meadow Run watersheds, respectively.

An ancillary objective of this research was to compare the sediment load reductions required for the impaired and their respective RWA-reference watersheds, using the DM. This comparison revealed that, both Taylor Creek and Turley Creek watersheds required less sediment load reduction than their respective reference watersheds, while the load reductions required for Long Meadow Run were slightly greater than its reference watershed.

There are several issues associated with either the RWA or the DM for developing sediment TMDLs. Those issues are discussed in detail. Recommendations the need for further studies, based in questions raised by the research presented here are also discussed.

Files
  Filename       Size       Approximate Download Time (Hours:Minutes:Seconds) 
 
 28.8 Modem   56K Modem   ISDN (64 Kb)   ISDN (128 Kb)   Higher-speed Access 
  Wallace_CW_T_2012.pdf 2.36 Mb 00:10:55 00:05:37 00:04:55 00:02:27 00:00:12

Browse All Available ETDs by ( Author | Department )

dla home
etds imagebase journals news ereserve special collections
virgnia tech home contact dla university libraries

If you have questions or technical problems, please Contact DLA.