

Type of Document Master's Thesis Author Hogan, Gregory A. URN etd-23261942972620 Title Evaluation of Military base Closure Alternatives Degree Master of Science Department Systems Engineering Advisory Committee
Advisor Name Title Carberry, V. Stephen Ioannou, George Sullivan, William Committee Chair Keywords
- privatization
- relocation
- military base closure
- BCRC recommendations
- dod outsourcing
Date of Defense 1997-02-11 Availability unrestricted Abstract This project defines a decision
support system developed to permit
the user to perform a cost - benefit
analysis for any military installation
cited for closure, relocation, or
privatization. The procedure
recognizes both the economic costs
and strategic benefits of a feasible
solution. Though the cost estimates
for a particular study may vary in
magnitude, the economic portion of
the model must focus on the net
savings to the tax payer. Detailed
cost estimates for each alternative
have been developed at a level so
that sensitivity analysis can be
performed on any of the input
parameters. Individual cost elements
have been summed to yield the net
cost increase / decrease to the
United States tax payer. The
resultant cost figures were converted
to an economic score. The paper
also describes a effective method to
evaluate the benefits derived from
implementing various alternatives. By
incorporating a group participative
process using multivoting and the
Dunn-Rankin technique, the values
resulting fro m benefits have yielded
a benefits score. The Brown-Gibson
model, which considers both
subjective and objective measures,
was used to depict the combination
of economic and benefit scores to
provide an overall cost - benefit
score. A graphical illustrat ion of the
cost - benefit tradeoffs serves as a
useful tool in assessing the risk
associated with a decision.
The results of the analysis have
supported the Department of the
Navy's decision to privatize the
Naval Air Warfare Center Aircraft
Division, Indianapolis, IN. The
Department of Defense is
considering alternatives for many
military installations, this process will
facilitate those decisions.
Files
Filename Size Approximate Download Time (Hours:Minutes:Seconds)
28.8 Modem 56K Modem ISDN (64 Kb) ISDN (128 Kb) Higher-speed Access etd.pdf 194.83 Kb 00:00:54 00:00:27 00:00:24 00:00:12 00:00:01 ETD.PDF 194.83 Kb 00:00:54 00:00:27 00:00:24 00:00:12 00:00:01
If you have questions or technical problems, please Contact DLA.