Type of Document Dissertation Author Eaglesham, Mark Alan Author's Email Address eagleshm@vt.edu URN etd-32298-92727 Title A Decision Support System for Advanced Composites Manufacturing Cost Estimation Degree PhD Department Industrial and Systems Engineering Advisory Committee
Advisor Name Title Deisenroth, Michael P. Committee Chair Killough, Larry N. Committee Member Mason, William H. Committee Member Sullivan, William G. Committee Member Van Aken, Eileen M. Committee Member Keywords
- manufacturing cost
- activity costs
- design decision support
- composites
Date of Defense 1998-04-10 Availability unrestricted Abstract The increased use of advanced composites in aerospace manufacturing has led to thedevelopment of new production processes and technology. The implementation of
advanced composites manufacturing technology is poorly served by traditional cost
accounting methods, which distort costs by using inappropriate volume-based
allocations of overhead. Activity-based costing has emerged as a methodology which
provides more accurate allocation of costs to products or activities by their usage of
company resources. Better designs may also be produced if designers could evaluate
the cost implications of their choices early in the design process. This research
describes a methodology whereby companies can improve product cost estimation at
the conceptual design phase, using intelligent searching and arrangement of existing
accounting data to enable designers to access the activity cost information more
readily. The concept has considerable scope for application in industry because it will
allow companies to make better use of information that is already being recorded in
their information systems, by providing it in a form which will enable designers to make
better informed decisions during the design process. The design decision support
framework is illustrated by applying it to a typical problem in aerospace composites
manufacturing. Feasibility of the approach is demonstrated using a prototype software
model of the Design Decision Support System, implemented using commercially
available software.
Files
Filename Size Approximate Download Time (Hours:Minutes:Seconds)
28.8 Modem 56K Modem ISDN (64 Kb) ISDN (128 Kb) Higher-speed Access etd.PDF 951.15 Kb 00:04:24 00:02:15 00:01:58 00:00:59 00:00:05
If you have questions or technical problems, please Contact DLA.